HCLT 同步企微通讯录验证口径

这个提交包含在:
2026-05-17 22:19:59 +08:00
父节点 769e1e4ca6
当前提交 1ccd675714
共修改 5 个文件,包含 15 行新增和 5 行删除
+2
查看文件
@@ -15,6 +15,7 @@ Read only what is relevant:
- After R5, first check the main R5/R6 contract status before planning trial-run or follow-up work; R5 must remain the completed gate and R6 must have its own Issue CSV before expanding scope.
- For UI/page work, PC/mobile/WeCom experience, approval UX, or domestic OA benchmarking, read `docs/产品设计规则.md` and `references/visual-qa.md`. DG8 makes Feishu workbench/approval the single main UI/layout reference, with Hyinda branding and project rules taking priority. DG9 adds the A/B/C page layering and shared workbench/mobile samples; choose the DG9 sample before designing or coding a page. Other products are only function/process/control references. Mobile page work must treat `docs/产品设计规则.md` as the source of truth for the unified mobile shell, icon grid, card lists, deep Push pages, sticky actions, safe-area, and cross-viewport matrix. 移动页必须先对齐该设计事实源,再进入实现或验证。
- For approval workflow, roles, self-approval, notification, deeplink, reminder, or escalation work, read `docs/需求-统一审批中心规约.md`.
- For HR lifecycle, employee onboarding/offboarding, Enterprise WeChat directory sync, or account disablement work, read `docs/需求-企业微信基础设施规约.md`, `docs/管理员手册.md`, and the latest HCLT/HRWD Issue CSV evidence first.
- For reimbursement, invoice, OCR, duplicate invoice, or attachment work, read `docs/报销发票附件规则.md` and `references/reimbursement.md`.
- For local/WeCom/public trial-run, OCR runtime, Caddy, or DB drift work, read `docs/试运行与自动化验证手册.md` and `references/trialrun.md`.
- For how this skill should evolve, read `docs/Agent开发交付实践.md`.
@@ -103,6 +104,7 @@ Final responses should include:
- R6 scope defaults to reimbursement, leave, procurement, approval, Enterprise WeChat entry/notification, finance payment/export.
- Do not expand to budget, ERP, AI, full travel, or complex BPM during R6; record those as follow-up Issues.
- Enterprise WeChat personal app message is the formal approval notification channel after R5; mock and group bots are not acceptance evidence for R6 business notification.
- After HRWD/HCLT, ERP is not a future OA integration target, Enterprise WeChat native approval is not the formal workflow, and OA-driven Enterprise WeChat directory create/update/disable is live verified. For later HR/WeCom directory issues, first check configuration, permission, department, and data-specific causes before treating the capability as unfinished.
- Approval-chain correctness can be proven by PC or automation, while Enterprise WeChat validates entry, binding,免登录, notification, deeplink, and mobile layout.
- If real-device mobile validation is paused after automation passes, record the gate as `PAUSED`; do not close RS6/UI6/R6 mobile blockers until representative real-device confirmation is recorded.
- Role-specific pages should use one shared OA/mobile framework and tailor summaries, entries, actions, and sensitive fields by role. Do not create unrelated UI systems for employee, approver, finance, admin, or CEO views.